R&D Cable Jointing provides 33kV cable jointing for renewables, infrastructure and private networks across the UK. We support planned programmes and repair works with site-ready delivery, manufacturer procedure compliance, and clear coordination with your project team. Based in Kent and working nationwide, we regularly support projects across London, Kent, Hertfordshire, Surrey, Suffolk, Cambridgeshire and Bedfordshire.

33kV Jointing for Renewables and Critical Infrastructure

33kV systems typically come with tighter controls, higher consequence and more coordination across civils, cable routes, substations and commissioning. We integrate with your programme and focus on safe, clean workmanship delivered without drama.

  • 33kV straight joints: XLPE insulated cables, cold shrink and push-on systems
  • 33kV fault repairs: joint failure and cable section replacement
  • Indoor and outdoor 33kV terminations
  • New 33kV circuits and connections for solar farms, wind, BESS and grid infrastructure
  • Multi-phase build and phased energisation support
  • Testing and commissioning coordination

Sectors We Support at 33kV

Our 33kV jointing experience covers a range of sectors and network types:

  • Solar farms and ground-mounted PV: inter-array cables and grid connection points
  • Battery Energy Storage Systems (BESS): HV connections and substation interfaces
  • Wind energy: onshore connection infrastructure
  • Grid infrastructure and primary network reinforcement
  • Industrial and commercial private 33kV networks
  • Data centre HV infrastructure

How We Deliver 33kV Cable Jointing

  • Scope confirmation: cable type, joint type, location constraints and outage windows confirmed upfront.
  • RAMS and controls: method statements aligned to your permits, site rules and working arrangements.
  • Controlled jointing: manufacturer procedures followed, consistent build-up and clean handling throughout.
  • Checks and readiness: jointing records completed, testing coordination and energisation support where required.
  • Clear handover: sign-off support and snag close-out.

Areas: Essex, London, Kent, Hertfordshire, Surrey, Suffolk, Cambridgeshire, Bedfordshire and nationwide. Contact us with your programme dates and location and we will confirm availability.

Ready to discuss your project?

Send us the scope, cable type, voltage and location and we'll come back with availability and a clear plan. No lengthy process, just a straight answer.